Surveying for towers is a key factor to the success of the structure. This is true for anything from a non-penetrating roof mounted structure to a 500’ guyed tower. During a tower survey the Netrepid team will plot out the proposed site and take the necessary measurements for all zoning and permitting as well as any FCC or FAA requirements. The team will also check for adequate locations for grounding, cable paths, electrical, and drainage. Surveys are done based on manufacturer specifications. Any installation deviations are designed and stamped by a staff P.E. |